Modular residential units, Zeewolde

Fast and flawless assembly of residential units

Due to long waiting lists for residential nursing care and major staff shortages in home care, more and more people are choosing to support their parents or other relatives in need of care themselves. One way of doing this is by placing a fully equipped care home on their own property, next to the main house.


Several timber construction companies are responding to this demand by building modular timber-frame care homes that are fully customised and delivered complete with all installations. In 2023, dozens of these care homes were completed, with Greenwinner providing the complete installation package. This included heating, cooling and ventilation, hot and cold water systems, PV panels, energy storage and electrical installations. For the electrical installations, the sustainable installer from Schijndel made a clear choice for Attema’s Installation 2.0 concept.

  • Innovative living solutions

    There are three residential blocks in Zeewolde, each with thirty modular units. These units, made up of container units of 3x12 meters, are completely prefabricated in Barneveld. "Thanks to our Install 2.0 concept, the assembly of all electrical techniques was fast and error-free," says Michel Boekweit, project manager at Attema. Elektrend took care of the electrical installations and took its first steps in 100% pluggable installation. "The advantages of pluggable installation - fast installation, simple manual work, and minimal failure costs - were crucial for this project," says Hans van den Brink, owner of Elektrend. Attema provided the complete plug-in engineering and RKwadraat the technical assembly of the prefabs.
  • Complete Installation set

    The Installation 2.0 concept includes all electrical technologies in the homes: from distribution boxes to cable boxes, smoke detectors, internet connections and more. "The power cables are traditional, but everything else is plug-and-play," says Boekweit. This efficient system makes it possible to work with less skilled staff, ideal for the current labor market. With Installation 2.0, installing becomes assembling. This project shows that we can realize high-quality homes with lower-skilled personnel and migrant workers. These homes are really built for and by migrant workers.

Do you have a project? Make an appointment!

Do you want to deliver maximum quality in less time, with fewer failure costs? Then quickly make an appointment with one of our specialists.